KPS Civil Contractors were the winning bid on the Central Coast Highway upgrade. Works included over 7000 meters of permenant soil nails and over 1,500 square meters of shotcrete.
KPS successfully tendered for the West Zone of the K2RQ project. Works included, over 10,000 metres of permanent rock bolts and soil nails, and over 15,000 square metres of shotcrete. All works were completed in a railway corridor.
KPS Civil Contractors were ingaged to complete the piling and shotcrete at the new Burwood Police Station. Works included bore piers at 450mm & 900mm diameters. A 200mm layer of reinforced shotcrete was also aplied.
KPS Civil Contractors were commissoned to stabalise and retain the embankment at the rear of the station platform. This included the installation of custom made stainless steel reinforcement mesh, stainless steel soill nails, and a layer of colour pigmented shotcrete. KPS had to develope a special safe working platform on the Hawksbury River for drilling. All shotcrete works were completed of a barge.
| HOME | SHORING | ASSOCIATED WORKS | CONTACT US |
| Our Company | Piling | Stabilisation Work | KPS Civil Contractors Pty Ltd |
| Design & Construct | Anchors | Rock Bolts/Soil Nails | A. 112 Carnarvon Street, Silverwater, NSW 2128 |
| Request a Quote | Shotcrete | Grout Injections | T. (02) 8748 5600 |
| Tight Access Work | E. This e-mail address is being protected from spambots. You need JavaScript enabled to view it. |
